<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="http://search.yahoo.com/mrss/">
<channel>
<title>TerraWatt</title>
<link>https://terrawatt.news/</link>
<description>Independent news on solar, storage, hydrogen, charging and data-center power projects worldwide — financing, developers, offtake and supply chains, with deep coverage of emerging markets.</description>
<language>en</language>
<lastBuildDate>Fri, 02 Oct 2026 14:14:54 GMT</lastBuildDate>
<atom:link href="https://terrawatt.news/rss.xml" rel="self" type="application/rss+xml"/>
<item>
<title>Who pays for a data center&#x27;s power plant? Google&#x27;s Arkansas contract answers it — and shows the cost of saying so out loud</title>
<link>https://terrawatt.news/22-google-entergy-prepayment</link>
<guid isPermaLink="true">https://terrawatt.news/22-google-entergy-prepayment</guid>
<description>Disclosed records show Google contributing $526 million toward a 600 MW solar and 350 MW battery plant, with Entergy putting the 20-year value at $2.1 billion. Inside the structure and the disclosure fight around it.</description>
<category>Data Centers</category>
<enclosure url="https://terrawatt.news/og/22-google-entergy-prepayment.png" type="image/png" length="44055"/>
<media:content url="https://terrawatt.news/og/22-google-entergy-prepayment.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Fri, 02 Oct 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Malaysia&#x27;s corporate green power scheme lands its first hyperscale deal: 680 MWac of solar, four hours of batteries, 21 years</title>
<link>https://terrawatt.news/21-malaysia-cress-datacenter</link>
<guid isPermaLink="true">https://terrawatt.news/21-malaysia-cress-datacenter</guid>
<description>Gamuda, SD Guthrie and Gentari sign a 21-year supply contract for a Perak solar-plus-storage plant feeding US data centers under CRESS, where a 14 sen access charge and a 2028 deadline set the terms.</description>
<category>Data Centers</category>
<enclosure url="https://terrawatt.news/og/21-malaysia-cress-datacenter.png" type="image/png" length="45997"/>
<media:content url="https://terrawatt.news/og/21-malaysia-cress-datacenter.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Fri, 02 Oct 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Hunterston shows what a UK battery needs to be financeable: a floor, a toll and a service contract</title>
<link>https://terrawatt.news/20-hunterston-uk-bess</link>
<guid isPermaLink="true">https://terrawatt.news/20-hunterston-uk-bess</guid>
<description>Financial close on Revera&#x27;s 400 MW / 800 MWh Scottish battery reveals the counterparty stack, with Sungrow on hardware and service, bp on tolling and Danske Commodities on the floor, that made four lenders comfortable.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/20-hunterston-uk-bess.png" type="image/png" length="37724"/>
<media:content url="https://terrawatt.news/og/20-hunterston-uk-bess.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Fri, 02 Oct 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>India puts 50 GWh of storage on the national balance sheet — and starts pricing it</title>
<link>https://terrawatt.news/19-india-storage-corridor</link>
<guid isPermaLink="true">https://terrawatt.news/19-india-storage-corridor</guid>
<description>Green Energy Corridor Phase-III commits Rs 50,000 crore to 50 GWh of batteries, while a Haryana tender lifts capacity charges 19%: what India&#x27;s storage market now pays, and where the risk sits.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/19-india-storage-corridor.png" type="image/png" length="44038"/>
<media:content url="https://terrawatt.news/og/19-india-storage-corridor.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Fri, 02 Oct 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>From shipping boxes to building plants: China&#x27;s storage supply chain puts down roots in the Gulf</title>
<link>https://terrawatt.news/18-china-storage-mena-factories</link>
<guid isPermaLink="true">https://terrawatt.news/18-china-storage-mena-factories</guid>
<description>Hithium&#x27;s 4 GWh SEC order, CATL&#x27;s Riyadh facilities and Sungrow&#x27;s planned Egyptian factory mark the shift from Chinese storage exports to Chinese storage manufacturing in MENA.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/18-china-storage-mena-factories.png" type="image/png" length="42268"/>
<media:content url="https://terrawatt.news/og/18-china-storage-mena-factories.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Johor&#x27;s AI data center race is really a power procurement race — and TNB is holding the cards</title>
<link>https://terrawatt.news/17-johor-ai-datacenter-power</link>
<guid isPermaLink="true">https://terrawatt.news/17-johor-ai-datacenter-power</guid>
<description>TM Nxera secures 280 MW from TNB for its Iskandar Puteri AI campus, the latest in a string of gigawatt-scale power deals that decide who gets to build AI capacity in Johor.</description>
<category>Data Centers</category>
<enclosure url="https://terrawatt.news/og/17-johor-ai-datacenter-power.png" type="image/png" length="40587"/>
<media:content url="https://terrawatt.news/og/17-johor-ai-datacenter-power.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>ACME commits $4.2bn to expand Oman&#x27;s Duqm green ammonia complex to ~900,000 tonnes a year</title>
<link>https://terrawatt.news/16-oman-acme-green-ammonia</link>
<guid isPermaLink="true">https://terrawatt.news/16-oman-acme-green-ammonia</guid>
<description>Phases 2 and 3 of ACME&#x27;s Duqm green hydrogen and ammonia project enter Oman&#x27;s national framework, with phase 1 due by end-2026 backed by offtake from Yara International.</description>
<category>Hydrogen</category>
<enclosure url="https://terrawatt.news/og/16-oman-acme-green-ammonia.png" type="image/png" length="46786"/>
<media:content url="https://terrawatt.news/og/16-oman-acme-green-ammonia.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Southeast Asia&#x27;s charging build-out enters its consolidation phase</title>
<link>https://terrawatt.news/15-sea-charging-consolidation</link>
<guid isPermaLink="true">https://terrawatt.news/15-sea-charging-consolidation</guid>
<description>Thailand tightens charger certification, VinFast&#x27;s V-Green chases 150,000 ports and Indonesia chases 30,000 stations — Southeast Asia&#x27;s EV charging market is consolidating around standards and utility-scale operators.</description>
<category>E-Mobility</category>
<enclosure url="https://terrawatt.news/og/15-sea-charging-consolidation.png" type="image/png" length="39293"/>
<media:content url="https://terrawatt.news/og/15-sea-charging-consolidation.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Africa&#x27;s battery-swap operators graduate to infrastructure finance: Spiro adds $18m as fleet passes 135,000</title>
<link>https://terrawatt.news/14-africa-emoto-swap</link>
<guid isPermaLink="true">https://terrawatt.news/14-africa-emoto-swap</guid>
<description>Africa Go Green Fund doubles its commitment to Spiro to $36 million as Africa&#x27;s electric two-wheeler market moves from pilots to asset-backed infrastructure — with China supplying the bikes.</description>
<category>E-Mobility</category>
<enclosure url="https://terrawatt.news/og/14-africa-emoto-swap.png" type="image/png" length="46410"/>
<media:content url="https://terrawatt.news/og/14-africa-emoto-swap.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Saudi Arabia shortlists 27 consortia for second 3 GW/12 GWh storage tender</title>
<link>https://terrawatt.news/13-saudi-bess-tender</link>
<guid isPermaLink="true">https://terrawatt.news/13-saudi-bess-tender</guid>
<description>SPPC&#x27;s second BESS procurement round puts six 500 MW/2,000 MWh independent storage projects up for bid under a build-own-operate model — the largest storage program outside China.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/13-saudi-bess-tender.png" type="image/png" length="44313"/>
<media:content url="https://terrawatt.news/og/13-saudi-bess-tender.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Australia picks 4.2GW/16.1GWh of batteries in one tender — here is who will build and own them</title>
<link>https://terrawatt.news/12-australia-cis-batteries</link>
<guid isPermaLink="true">https://terrawatt.news/12-australia-cis-batteries</guid>
<description>Australia selected 4.2 GW / 16.1 GWh of battery projects under Tender 8 of the Capacity Investment Scheme. The full award list — developer, owner, state, construction, financing and commissioning dates.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/12-australia-cis-batteries.png" type="image/png" length="41190"/>
<media:content url="https://terrawatt.news/og/12-australia-cis-batteries.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Negative prices push Europe&#x27;s solar fleet into storage: the financing wave in Spain, Italy and beyond</title>
<link>https://terrawatt.news/11-europe-storage-financing-wave</link>
<guid isPermaLink="true">https://terrawatt.news/11-europe-storage-financing-wave</guid>
<description>Spain logged 397 hours of negative day-ahead prices in Q1 2026, against 48 a year earlier. That arithmetic, not policy, is driving Europe&#x27;s storage wave — the financings, the lenders and the economics.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/11-europe-storage-financing-wave.png" type="image/png" length="45205"/>
<media:content url="https://terrawatt.news/og/11-europe-storage-financing-wave.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>The ERCOT template: how contracted revenue is making US storage a repeatable finance product</title>
<link>https://terrawatt.news/10-us-ercot-storage-template</link>
<guid isPermaLink="true">https://terrawatt.news/10-us-ercot-storage-template</guid>
<description>Three Texas financings show standalone US storage becoming an infrastructure product rather than a merchant bet: four-hour batteries, investment-grade tax equity, contracted revenue. Why the pattern travels.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/10-us-ercot-storage-template.png" type="image/png" length="43238"/>
<media:content url="https://terrawatt.news/og/10-us-ercot-storage-template.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Solar-storage-charging hubs move from pilot to standard across emerging markets</title>
<link>https://terrawatt.news/09-solar-storage-charging</link>
<guid isPermaLink="true">https://terrawatt.news/09-solar-storage-charging</guid>
<description>Solar-storage-charging hubs are crossing from pilots to standard infrastructure in Africa and Southeast Asia, driven by weak grids and storage mandates. Configurations, costs, and who is supplying them.</description>
<category>E-Mobility</category>
<enclosure url="https://terrawatt.news/og/09-solar-storage-charging.png" type="image/png" length="42108"/>
<media:content url="https://terrawatt.news/og/09-solar-storage-charging.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Behind the meter: how data center builders in Africa and the Gulf are engineering their own power</title>
<link>https://terrawatt.news/08-datacenter-btm-energy</link>
<guid isPermaLink="true">https://terrawatt.news/08-datacenter-btm-energy</guid>
<description>As AI load outruns grid capacity, data center developers in Africa and the Gulf are engineering their own generation. What the largest operators are ordering, and how much of it sits behind the meter.</description>
<category>Data Centers</category>
<enclosure url="https://terrawatt.news/og/08-datacenter-btm-energy.png" type="image/png" length="42319"/>
<media:content url="https://terrawatt.news/og/08-datacenter-btm-energy.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Jordan signs $1bn agreement for off-grid green ammonia complex at Aqaba</title>
<link>https://terrawatt.news/07-aqaba-green-ammonia</link>
<guid isPermaLink="true">https://terrawatt.news/07-aqaba-green-ammonia</guid>
<description>Jordan signed a $1 billion agreement with Jordan Green Ammonia for an off-grid hydrogen and ammonia complex at Aqaba — the country&#x27;s first approved green ammonia project, and one of the region&#x27;s most advanced.</description>
<category>Hydrogen</category>
<enclosure url="https://terrawatt.news/og/07-aqaba-green-ammonia.png" type="image/png" length="41551"/>
<media:content url="https://terrawatt.news/og/07-aqaba-green-ammonia.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Chinese EPCs and battery makers cement lead in MENA&#x27;s storage build-out</title>
<link>https://terrawatt.news/06-china-epc-storage-mena</link>
<guid isPermaLink="true">https://terrawatt.news/06-china-epc-storage-mena</guid>
<description>From Noor Midelt I to Gulf tenders, Chinese EPCs and battery makers are taking the MENA storage build-out contract by contract — capacity, suppliers and contractors compiled in one place.</description>
<category>Storage</category>
<enclosure url="https://terrawatt.news/og/06-china-epc-storage-mena.png" type="image/png" length="43423"/>
<media:content url="https://terrawatt.news/og/06-china-epc-storage-mena.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Philippines inaugurates Phase I of MTerra Solar, world&#x27;s largest integrated solar-plus-storage project</title>
<link>https://terrawatt.news/05-mterra-philippines</link>
<guid isPermaLink="true">https://terrawatt.news/05-mterra-philippines</guid>
<description>Phase I of MTerra Solar has been energised at 1,373 MW alongside 3.3 GWh of storage, on the way to 3.5 GW and 4.5 GWh. What it took for the Philippines to build the world&#x27;s largest integrated solar-and-battery project.</description>
<category>Solar &amp; Wind</category>
<enclosure url="https://terrawatt.news/og/05-mterra-philippines.png" type="image/png" length="43785"/>
<media:content url="https://terrawatt.news/og/05-mterra-philippines.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Qair reaches first disbursement on €37.9m financing for Chad&#x27;s first utility-scale hybrid solar plants</title>
<link>https://terrawatt.news/04-qair-chad-hybrid</link>
<guid isPermaLink="true">https://terrawatt.news/04-qair-chad-hybrid</guid>
<description>Qair drew first disbursement on €37.9 million for Chad&#x27;s first utility-scale solar-plus-storage plants: 30 MWp with 8 MWh across two N&#x27;Djamena sites, financed through DFI-blended capital.</description>
<category>Solar &amp; Wind</category>
<enclosure url="https://terrawatt.news/og/04-qair-chad-hybrid.png" type="image/png" length="46049"/>
<media:content url="https://terrawatt.news/og/04-qair-chad-hybrid.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>AfDB backs Egypt&#x27;s largest private corporate PPA: 500MW Dandara solar-plus-storage to power aluminum producer</title>
<link>https://terrawatt.news/03-dandara-corporate-ppa</link>
<guid isPermaLink="true">https://terrawatt.news/03-dandara-corporate-ppa</guid>
<description>The AfDB&#x27;s $66 million package for the 500 MW Dandara project backs Egypt&#x27;s largest private corporate PPA — an aluminum smelter buying solar and storage directly, with EU carbon costs as the commercial driver.</description>
<category>Solar &amp; Wind</category>
<enclosure url="https://terrawatt.news/og/03-dandara-corporate-ppa.png" type="image/png" length="51000"/>
<media:content url="https://terrawatt.news/og/03-dandara-corporate-ppa.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Egypt&#x27;s sovereign-backed hybrid solar-storage structure becomes MENA&#x27;s bankability template</title>
<link>https://terrawatt.news/02-egypt-hybrid-template</link>
<guid isPermaLink="true">https://terrawatt.news/02-egypt-hybrid-template</guid>
<description>Egypt&#x27;s 1.1 GW Obelisk solar-plus-storage project has become the template the EBRD is applying across the region: a sovereign-backed hybrid structure that made a battery financeable inside a utility-scale solar deal.</description>
<category>Solar &amp; Wind</category>
<enclosure url="https://terrawatt.news/og/02-egypt-hybrid-template.png" type="image/png" length="43628"/>
<media:content url="https://terrawatt.news/og/02-egypt-hybrid-template.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
<item>
<title>Masdar closes $6.1bn for world-first gigascale round-the-clock solar-plus-storage project in Abu Dhabi</title>
<link>https://terrawatt.news/01-masdar-rtc-financial-close</link>
<guid isPermaLink="true">https://terrawatt.news/01-masdar-rtc-financial-close</guid>
<description>Masdar reached financial close on a 5.2 GW solar plant paired with 19 GWh of storage in Abu Dhabi — a $6.1 billion project contracted to deliver round-the-clock power. Who supplied it, and why the line-up changed.</description>
<category>Solar &amp; Wind</category>
<enclosure url="https://terrawatt.news/og/01-masdar-rtc-financial-close.png" type="image/png" length="46009"/>
<media:content url="https://terrawatt.news/og/01-masdar-rtc-financial-close.png" medium="image" type="image/png" width="1200" height="630"/>
<pubDate>Sun, 27 Sep 2026 08:00:00 GMT</pubDate>
</item>
</channel></rss>